0531-84222017
福州升降机安装后,安全装置要经试验、检测合格后方可操作使用,升降货梯必须由持证的专业司机操作。 Fuzhou elevator safety device to be installed, tested, qualified rear can operate, lifting elevator must be operated by a licensed professional driver.
福州升降机底笼周围2.5M范围内,必须设置稳固的防护栏杆,各停靠层的过桥和运输通道应平整牢固,出入口的栏杆应安全可靠。Fuzhou elevator cage around the 2.5M, the need to set up a solid protective railing, each layer of the bridge and the transport corridor should be smooth and solid, the entrance of the railing should be safe and reliable.
福州升降机首次运行时,应空载及满载试运行,将升降货梯笼升离地面1M左右停车、检查制动器灵活性,确认正常后方可投入运行。 Fuzhou elevator for the first time, should be unloaded and full load test run, lift the cargo ladder cage away from the ground about 1M stop, check the brake flexibility, confirmed normal can be put into operation.
限速器、制动器等安全装置必须由专人管理,并按规定进行调试检查,保持其灵敏度可靠。Speed limiter, brakes and other safety devices must be managed by the person, and in accordance with the provisions of the commissioning inspection, to maintain its sensitivity and reliability.
福州升降机笼乘人载物时应使荷载均匀分布,严禁超载使用,严格控制载运重量。 Fuzhou passenger elevator cage loading should be uniformly distributed, overloading is strictly forbidden to use, strictly control the carrying weight.
福州升降机运行至最上层和最下层时仍要操纵按钮,严禁以行程限位开关自动碰撞的方法停车。Fuzhou elevator operation to the top and the bottom of the still need to manipulate the button, is strictly prohibited to travel limit switch automatic collision method of parking.
多层施工交叉作业同时使用电梯时,要明确联络信号。风力达6级以上应停止使用电梯、并将升降货梯降到底层。When using the elevator at the same time, it is necessary to make clear the contact signal. Wind up to 6 or more should stop using the elevator, and lift the elevator down to the bottom layer.
各停靠层通道口处应安装栏杆或安全门,其它周边各处应用栏杆和立网等材料封闭。 Each layer of the mouth should be installed at the mouth of the railing or safety door, the other around the fence and the application of the fence and other materials closed.
当福州升降机未切断总源开关前,操作员不能离开操作岗位。作业完后、将升降货梯降到底层,各控制开关扳至零位,切断电源。The operator can not leave the operating position before the Fuzhou elevator has been cut off. After the completion of the work, will lift the goods ladder down to the bottom, the control switch to zero, cut off the power supply.